How can I made the inspection lot skip through use

How can I made the inspection lot skip through use

题目
How can I made the inspection lot skip through use
I use dynamic modification rule in my inspection plan. So the lot will change according to the rule when UD was made. The situation is incoming quality control, and the lot will create accoring to GR posting.Then the problem occurs. I have two PO type. One is NB as the standard one. And another is ZNB, the order type is using material which is claim for compensation. Because we adopt one way to do GR for both order type. Then the inspection lot 's quality level will confused by two. Is there any to make the inspeciton lot which created by ZNB order irrelevant to the rule? If the user exit can meet my requirement, how to do it?Thank you. The problem is urgent to slove.
答案
Thank you Daniel Pereira.I do that because there are so many GR post.All that is for vendor complaiment.For finical resons,our stocker will post it many times.And so there will be as many as inspectio...
举一反三
我想写一篇关于奥巴马的演讲的文章,写哪一篇好呢?为什么好
奥巴马演讲不用看稿子.为什么中国领导演讲要看?
想找英语初三上学期的首字母填空练习……
英语翻译
1,人们染上烟瘾,最终因吸烟使自己丧命.
最新试题
热门考点

超级试练试题库

© 2017-2019 超级试练试题库,All Rights Reserved.