英语翻译
题目
英语翻译
我很希望能为你做点什么,同时我也想成为你的笔友.
请尽快给我回信.
我也想了解关于你更多的情况.
答案
Uses entire station meter Shi Ceda the cross section the method mainly to have the coordinate and the opposite side survey law two kinds.Erects the control point the entire station meter the coordinate survey law,the merit is may unifies the topographic survey and the big cross section survey also carries on,but increased the quantity to take the instrumental height the error,the survey elevation's precision compared does not erect must be slightly low in the control point coordinate and the opposite side survey law.Does not measure takes the instrumental height the coordinate and the opposite side survey method measuring accuracy is the same,may meet four and so on leveling requirements at least.The recommendation uses entire station meter opposite side survey law Shi Ceda the cross section.The opposite side survey law is more advanced than the coordinate survey law,the measuring accuracy is higher,sets up a station the operation only to need to level off the instrument strictly,the survey record data quantity are few,moreover does not need to transform the data through the computer,makes the simple algebra and the operation to various measuring points' elevation difference,then forms the big cross section survey achievement.Should pay attention to the following several points for the guarantee elevation measuring accuracy:Observes the personnel first to want the fine sight to the pole's prism center; Maintains as far as possible to the pole highly is lowest and fixed invariable,holds the pole person to pour on rhabdomere's round standard to soak closely comes,guaranteed that is at the vertical condition to the pole; Between two measuring point's distances cannot be too long,farthest does not surpass 500 m; Should establish as far as possible the instrument in two measuring point segment center point or approaches the segment.Looking from the practical application,the entire station meter is more advanced than the traditional level,the survey and the computation work load are the reductions greatly,and are been few topographical condition's limit,the work nimble,direct-viewing,the operation is simple,the survey speed is quick,the precision is high,may raise the working efficiency greatly and reduce the labor intensity,can replace the level to carry on the big cross section survey.
举一反三
已知函数f(x)=x,g(x)=alnx,a∈R.若曲线y=f(x)与曲线y=g(x)相交,且在交点处有相同的切线,求a的值和该切线方程.
我想写一篇关于奥巴马的演讲的文章,写哪一篇好呢?为什么好
最新试题
热门考点
- 已知集合A={x|x<-1或x>2},B={x|4x-p<0},若AB ,实数p的取值范围.
- 一个正方体的棱长总和是48分米,它的表面积是_平方分米.
- 江西人民出版社9年级下数学一课一练答案
- 初三几道英语问题,求高人解答
- 已知三角形ABC中,AD垂直BC于D,BE垂直AC于E,求证三角形ABC相似三角形DEC
- 英语中形容男孩和形容女孩的形容词有什么区别如题 谢谢了
- 在用二氧化氮气体做气体的扩散实验师,装有二氧化氮的集气瓶放在下面,这样做的原因是?
- 如果两个球的体积之比为8:27,那么两个球的表面积之比为( ) A.8:27 B.2:3 C.4:9 D.2:9
- 5个连续整数的和是55,求这5个整数.
- What does it mean to chinese in the 21st century?