19.4 The performance of either party’s obligations will be in such a case postponed with the period of the existence of the Force Majeure event plus a reasonable period to remobilizing production and shipping.No penalty shall be payable for the duration of this delay.
19.5 Should the delay caused by a Force Majeure event last for more than I (one) month the sides will attempt to agree measures to allow contract to continue.Should such an agreement not be reached within 30 (thirty) days from the date of certified Force Majeure event,the sides are entitled to terminate the contract.
19.6 The Force Majeure event does not exonerate the Buyer from paying for the goods already delivered under documents in section 11.1 Commercial Invoice.
答案
19.4 各方义务的履行在这种情况下将会被推迟,期间为不可抗力事件的存续时间加上合理的恢复生产和运输的时间段.这一延迟将不会有罚金需要支付.
19.5. 如果由不可抗力引起的延迟持续超过一(壹)个月,各方应尝试为合同的继续执行而采取的措施达成协议.如果自被证实的不可抗力事件发生后30(叁拾)日内未能达成这一协议,各方有权终止该合同.
19.6. 不可抗力事件并不免除买方在在11.1节“商务发票”项下对已发货物的付款责任.
举一反三
已知函数f(x)=x,g(x)=alnx,a∈R.若曲线y=f(x)与曲线y=g(x)相交,且在交点处有相同的切线,求a的值和该切线方程.
我想写一篇关于奥巴马的演讲的文章,写哪一篇好呢?为什么好
奥巴马演讲不用看稿子.为什么中国领导演讲要看?
想找英语初三上学期的首字母填空练习……
英语翻译
最新试题
热门考点

超级试练试题库

© 2017-2019 超级试练试题库,All Rights Reserved.