请教:英文达人帮忙翻译,120个词左右就成
题目
请教:英文达人帮忙翻译,120个词左右就成
麻烦各位英文强人帮忙翻译下面的汉语,尽量华丽点哈~~·不胜感激!
我们做任何事情都会事先做个计划,有了计划能让我们做事做的更加自如,从而达到事半功倍的效果,建筑工程也不例外. 施工进度计划是施工组织设计的中心内容,它要保证建设工程按合同规定的期限交付使用,并且保证工程项目的质量.施工中的其他工作必须围绕着并适应施工进度计划的要求安排.有了施工进度计划,不仅可以保障施工项目的顺利进行,还能够优化整个施工过程.在施工进度计划的工程中,更加方便与管理整个施工过程,从而达到预期的目标.
答案
We should make a plan in advance before anything, with the plan allow us to do things more freely, so as to achieve a multiplier effect, construction is no exception. Construction schedule plan is the centre of the construction organization design, it is to ensure that construction works under the contract delivery period and to ensure project quality. Other work must be centered on the construction schedule to adapt to the requirements of the arrangements. With the construction schedule, not only to protect the smooth progress of the projects, but also can optimize the entire process. In the construction schedule of projects, it's more convenient to manage the entire construction process, so as to achieve the desired objectives.
举一反三
已知函数f(x)=x,g(x)=alnx,a∈R.若曲线y=f(x)与曲线y=g(x)相交,且在交点处有相同的切线,求a的值和该切线方程.
我想写一篇关于奥巴马的演讲的文章,写哪一篇好呢?为什么好
最新试题
热门考点