英语翻译
题目
英语翻译
摘要:工程项目竣工结算存在诸多问题,导致审计不能忠实反映工程的实际造价,企业不能收回应有的收益.本文从工程施工前的准备阶段、工程施工中的收集、签证阶段及结算校审阶段三个方面,就工程竣工结算工作中把握的要点进行了阐述.
关键词:竣工结算 结算
答案
Abstract:the engineering project completion settlement has many problems,lead to the audit can't accurately reflect the actual cost of the project,the enterprise cannot be recovered due income.This article from the preparation for the project construction,project construction phase of the collection,visa stage and clearing the three aspects of the phase,project completion and balance the grasp of points is discussed in this paper.
Keywords:upon the completion of the clearing and settlement
举一反三
已知函数f(x)=x,g(x)=alnx,a∈R.若曲线y=f(x)与曲线y=g(x)相交,且在交点处有相同的切线,求a的值和该切线方程.
我想写一篇关于奥巴马的演讲的文章,写哪一篇好呢?为什么好
最新试题
- 以“教育与未来”为题作文800字左右
- There is____(little)money in this red packet than in that one.
- 坐而论道,不如起而行之
- 请问什么叫做卤代烃?
- 若(1-2i)i=a+bi(a,b∈R,i为虚数单位),则ab=_.
- Innovation sustains the progress of a society.
- 书面表达,介绍你的房间,需要用到的词wall,desk,bookcase,near,window,bed,chair
- 我认为:稀盐酸和氧化铜反应,生成氯化铜溶于水才使氧化铜溶解,对么?不对的话为什么?
- 数论等式证明:[ab,bc,ca]=[a,b,c][(a,b),(b,c),(c,a)]
- 直接碘量法和间接碘量法的滴定剂各是什么?1
热门考点