英语翻译

英语翻译

题目
英语翻译
请各位英语达人帮忙翻译下面的汉语,我讲奉献我得全部财产!
我们做任何事情都会事先做个计划,建筑工程也不例外.施工进度计划是施工组织设计的中心内容,它要保证建设工程按合同规定的期限交付使用.施工中的其他工作必须围绕着并适应施工进度计划的要求安排.
麻烦请稍微展开一下,扩展到120个词左右,现在才50多个,实在有点少~
答案
We will do anything in advance to be a plan,construction is no exception.Construction schedule plan is central to the construction organization design,it is to ensure that construction works under the contract delivery period.Construction and other work must be centered on the construction schedule to adapt to the requirements of the arrangements.Combined with the actual situation and characteristics of this project,with clear division of labor,coordinated deployment of construction,construction personnel to dynamic management.The project task team with the appropriate professional management personnel,technicians and mechanical equipment,and work need to be established in accordance with the construction team and reasonable arrangements for parallel and cross-flow operation.
Each sub-project and process 100% pass rate,good rate of 80%,a qualified acceptance,to ensure the quality of the project to achieve compliance.Firmly establish the "quality first for efficiency,users first create credibility" business philosophy,correctly handle the "quality,duration,cost,safety," the four relations.Adhere to the "five steps in place," the quality control standards,eliminate rework the phenomenon to the quality of work product quality assurance.Five steps in place:first,in sub-construction,management of operating points to achieve classification of components in place; second,the upper and lower transition process in place;
举一反三
已知函数f(x)=x,g(x)=alnx,a∈R.若曲线y=f(x)与曲线y=g(x)相交,且在交点处有相同的切线,求a的值和该切线方程.
我想写一篇关于奥巴马的演讲的文章,写哪一篇好呢?为什么好
奥巴马演讲不用看稿子.为什么中国领导演讲要看?
想找英语初三上学期的首字母填空练习……
英语翻译
最新试题
热门考点

超级试练试题库

© 2017-2019 超级试练试题库,All Rights Reserved.